Skip to content
Log in
4745
Videos
Item
of 57
Actions
Share
Feedback
Deploying the Controlled-source Electromagnetic Experiment
This item is active and ready to use
Deploying the Controlled-source Electromagnetic Experiment
Comments
(0)
Item details
iBase ID
8873
Reference ID
Deploying the Controlled-source Electromagnetic Experiment.mp4
Title
Deploying the Controlled-source Electromagnetic Experiment
Date
2009-09-18 00:00:00
Copyright/Credit
Ocean Networks Canada
Access Level
Public
Description
Keyword Tags
Notes
File metadata
The CSEM equipment consists of a transmitter, affixed to a small instrument platform, and a string of 5 receivers, spaced 200m apart along a 1km cable. The cable and receivers were spooled onto a drum, which was connected to ROCLS. Both of these payloads were lowered by winch from the deck of the R/V Thompson to the seafloor.
The CSEM deployment involved two ROPOS dives and two equipment drops using the ship's winch. The man of the hour during all of this was University of Toronto doctoral candidate Reza Mir, who joined the installation cruise to help coordinate and oversee installation.
Once the ROCLS spool and the transmitter platform were placed on the seafloor, ROPOS flew down, attached to ROCLS, laid the 1km reciever string and recovered ROCLS to the ship. In the following dive, ROPOS again located the transmitter platform, arranged two heavy dipoles on the seafloor nearby, connected it to the receiver string and connected the ODP 889 instrument platform to the CSEM platform.
CSEM
Labels
2009
Instruments
This item includes these files
Video
Links
Other items like this