Hauling the umbilical cable onto the deck

This item is active and ready to use
Hauling the umbilical cable onto the deck
Hauling the umbilical cable onto the deck
Hauling the umbilical cable onto the deck
Item details
iBase ID
1638
Reference ID
Liam_single_handed_webres.jpg
Title
Hauling the umbilical cable onto the deck
Date
2014-09-17 00:00:00
Creator
Ocean Networks Canada
Copyright/Credit
  • Ocean Networks Canada
Location
  • Saanich Inlet
Access Level
Public
Camosun College mechanical engineering students Liam Gibb hauls an umbilical cable onto the quarterdeck of the CCGS Tully during maintenance operations of the Wiring the Abyss September 2014 expedition. Photo taken 17 September 2014.
Labels
This item includes these files